Skip to main content

Please Select Your Country/Language Preferences

Print
exchange place case study

Energy-Efficient Ramp Heating

Energy-Efficient Ramp Heating 

Exchange Place | Edinburgh, Scotland

Challenge: 

Exchange Place, a high profile investment bank with three separate office buildings, sought a solution for ice melting on a series of concrete ramps. A quick turnaround of four months from design to commissioning was required, and flexible installation was a necessity. 

Solution: 

nVent RAYCHEM EM2-XR self-regulating cable was chosen for its robust, flexible installation abilities. Cut to length on-site, it allowed for quick installation and met all specific design requirements. Combined with a smart control and monitoring solution, the site saw an overall reduction of running and maintenance costs.